This dated condo bathroom had lino a steel low profile tub, thin 6" tile walls and carpeted halls over 7/8" OSB plywood on 24" TGI joists. The unit had above ad leaked into this condo which comprised the subfloor. The customer wanted a 1' x 2' porcelain tile installed on the floor usually I'd install an extra 1/2" spruce plywood to reinforce the subfloor. The 7/8" subfloor warped with moisture from above making a conventional reinforcement impossible. To reinforce I'd stapled a plaster mesh and poured a 1/2" floor leveler over it.
The bathroom self explanatory.
"finishing what has been started" Bathroom/Kitchen updating and Basement developing & Any projects completed, no deposits required. BBB Accredited member since 2009, Licensed to operate in Edmonton, posses 2 million Liability Insurance & Valid WCB account Workmanship is guaranteed for 1 year. Many online reviews Yelp, BBB and the website www.finishingtheunfinished.ca
Friday, December 5, 2014
Condo Bathroom
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment