Bathroom

Bathroom
Figure out where to start

Renovation Advice

Follow this Blog for posts of new projects we are working on. Bathroom Renovation - Basement Finishing - Kitchen Updating

Monday, June 8, 2015

Tiled bathroom

This bathroom  involved removing all fixtures except the tub, installing concrete board on shower walls, tiling the tub walls, floor, rail height tile behind fixtures and base tile with edging.
The existing vinyl window not typically found in a shower has finished without trim only wood jamb, caulk and the oil paint applied on the ledge and sides to protect from water damage.