This bathroom involved removing all fixtures except the tub, installing concrete board on shower walls, tiling the tub walls, floor, rail height tile behind fixtures and base tile with edging.
The existing vinyl window not typically found in a shower has finished without trim only wood jamb, caulk and the oil paint applied on the ledge and sides to protect from water damage.
"finishing what has been started" Bathroom/Kitchen updating and Basement developing & Any projects completed, no deposits required. BBB Accredited member since 2009, Licensed to operate in Edmonton, posses 2 million Liability Insurance & Valid WCB account Workmanship is guaranteed for 1 year. Many online reviews Yelp, BBB and the website www.finishingtheunfinished.ca
Monday, June 8, 2015
Tiled bathroom
Subscribe to:
Posts (Atom)