Follow this Blog for posts of new projects we are working on. Bathroom Renovation - Basement Finishing - Kitchen Updating

Thursday, July 2, 2015

Bathroom Update using existing tub.

This customer asked me to strip rotted walls down, insulate the exterior wall replace plaster with concrete board, strip the floor, new subfloor, toilet flange, tiled tub walls rail height wet wall and install new fixtures.

The update was completed in 7 days.

Deck

I have just finished this deck the customer  requested it be built before the next project for the same customer, a bathroom update.

Nice change to be outside getting sun!!!

Monday, June 8, 2015

Tiled bathroom

This bathroom  involved removing all fixtures except the tub, installing concrete board on shower walls, tiling the tub walls, floor, rail height tile behind fixtures and base tile with edging.
The existing vinyl window not typically found in a shower has finished without trim only wood jamb, caulk and the oil paint applied on the ledge and sides to protect from water damage.

Tuesday, March 10, 2015

Custom tiled tub/shower

This bathroom s framing was only 57" not quite enough for the common tub, so the customer requested a custom tiled tub/ shower. As with all of my custom shower enclosures I installed a vinyl pan liner with a sloped concrete base with tile. The opening was closed off with a factory glass door system. The tapset had a 3way divert, tub spout, rainhead and wand. For convenience sake I'd installed a niche for soaps and shampoos.