Bathroom

Bathroom
Figure out where to start

Renovation Advice

Follow this Blog for posts of new projects we are working on. Bathroom Renovation - Basement Finishing - Kitchen Updating

Wednesday, October 10, 2012

1/2 bath basement bathroom

This bathroom had a vanity & toilet with a swinging door that used up floor space.
In two weeks I'd installed a new toilet, vanity & shower drains in the concrete. The open concept bathroom now has a tiled angular shower, toilet, vanity, bath fan, updated electrical & a pocket door.


Friday, August 17, 2012

Tile floor

We've finished 500 sq of 1x2 porcelain tile. Quite a challenge floating thin set over concrete humps.




Wednesday, May 9, 2012

Rock accent Entertainment center

We had removed a planter box in this Living room stripped it down to the joists then glued & screwed 5/8" plywood to the joists. Glue as well for the Entertainment center walls covering the studs with 1/2" plywood then concrete board over that.
The electrical, CAT6, & COAX has been installed through an 1 1/2" vinyl conduit, mostly to accommodate future component wiring.
Now we are installing the rock.




Saturday, March 31, 2012

Concrete leveled

<p>Today I've finished the sunken concrete pad in this addition. The new concrete pour coupled with concrete pillars under the foundation will compensate for the lack of footings. Which has caused the sagging on the addition.


Wednesday, March 28, 2012

Tuesday, March 27, 2012

Sump drain

The drain has been run through the concrete foundation the drywall will b taped today


Thursday, March 8, 2012

Bearing wall

I've hammered out 3 holes in the concrete now to dig down 4'& install a concrete slab this addition will. Stop settling now


Wednesday, March 7, 2012

Mobile home bathroom update

This bathroom in a mobile had been complete demolished and I had installed a new spa tub tile limo vanity closet. Night - day this project is.

Thursday, February 16, 2012

curves

Curves created a unique space in this basement.

Dormers

This home we installed two functional dormers, interior finish with window seats & rounded corners.

Sunday, February 12, 2012

Modular Home Bathroom Reno

This Double wide mobile home had a stand up shower, 2 walls separating the from sink. Now all the new electrcical, plumbing, flooring, drywall, insulation, one spacious bathroom. Bipass mirror closet doors for storage, a deep soaker heated spa tub. 

Thursday, January 26, 2012

Maternity Room

We installed this closet organizer, custom shelving and gave the room a complete new color. The customer is using it as a maternity room.