This bathroom had a vanity & toilet with a swinging door that used up floor space.
In two weeks I'd installed a new toilet, vanity & shower drains in the concrete. The open concept bathroom now has a tiled angular shower, toilet, vanity, bath fan, updated electrical & a pocket door.
"finishing what has been started" Bathroom/Kitchen updating and Basement developing & Any projects completed, no deposits required. BBB Accredited member since 2009, Licensed to operate in Edmonton, posses 2 million Liability Insurance & Valid WCB account Workmanship is guaranteed for 1 year. Many online reviews Yelp, BBB and the website www.finishingtheunfinished.ca
Wednesday, October 10, 2012
1/2 bath basement bathroom
Friday, August 17, 2012
Tile floor
We've finished 500 sq of 1x2 porcelain tile. Quite a challenge floating thin set over concrete humps.
Wednesday, May 9, 2012
Rock accent Entertainment center
We had removed a planter box in this Living room stripped it down to the joists then glued & screwed 5/8" plywood to the joists. Glue as well for the Entertainment center walls covering the studs with 1/2" plywood then concrete board over that.
The electrical, CAT6, & COAX has been installed through an 1 1/2" vinyl conduit, mostly to accommodate future component wiring.
Now we are installing the rock.
Saturday, March 31, 2012
Concrete leveled
<p>Today I've finished the sunken concrete pad in this addition. The new concrete pour coupled with concrete pillars under the foundation will compensate for the lack of footings. Which has caused the sagging on the addition.
Wednesday, March 28, 2012
Tuesday, March 27, 2012
Thursday, March 8, 2012
Bearing wall
I've hammered out 3 holes in the concrete now to dig down 4'& install a concrete slab this addition will. Stop settling now
Wednesday, March 7, 2012
Mobile home bathroom update
This bathroom in a mobile had been complete demolished and I had installed a new spa tub tile limo vanity closet. Night - day this project is.