This basement bathroom we started completely from scratch installed all new fixtures, tile, drywall, insulation, paint and trim. On of my prior posts, replacing corroded drain pipes, was part of this project.
"finishing what has been started" Bathroom/Kitchen updating and Basement developing & Any projects completed, no deposits required. BBB Accredited member since 2009, Licensed to operate in Edmonton, posses 2 million Liability Insurance & Valid WCB account Workmanship is guaranteed for 1 year. Many online reviews Yelp, BBB and the website www.finishingtheunfinished.ca
Sunday, November 13, 2011
Safety Tub installation, tiled throughout.
We completely dismantled this 50 year old homes bathroom, re-wired, re-plumbed, re-inforced framing, subfloor, tiled the walls, floor, painted, new pedestal sink, toilet and Safety Tub installed.
Subscribe to:
Posts (Atom)